Pool models, construction conditions and care to help you plan your project.
In this guide 4
Application note: Chemical doses, pH/chlorine targets, operating times and maintenance intervals are determined according to the product label, measured water values, the usage class and local requirements. Numerical examples are not, on their own, application instructions. Chemicals must not be mixed with one another; electrical work, pressurized equipment and pool draining operations must be carried out under expert supervision. The time periods and budget proportions given in this text are example planning assumptions.
When, after many years, the waterproofing of a ceramic or mosaic tiled pool needs to be renewed or its colour changed, part of the coping stones at the pool edge, the surrounding ceramics and the walkway paving may have to be removed, depending on the covering detail. This demolition process creates construction rubble and noticeably increases the cost of the renovation. The Hung Locking Profile (Vacuum Channel Locking System) used in Sermed Havuz's engineering solutions aims, thanks to an extruded aluminium or PVC locking channel concealed beneath the coping stones, to allow liner renewal to be carried out generally without touching the surrounding coverings. This does not mean that all reinforced concrete pools inevitably cause problems; both approaches have their own field of use when correctly designed.
A design that does not plan today for its future renovation remains incomplete. The Hung profile is an elegant engineering detail intended to extend the service life of your pool's covering with minimal intervention in your landscaping.
01. The Ordeal of Ceramic Demolition vs. Sensible Hung Locking Profile Architecture
The site burdens that may be experienced when renewing a pool covering are as follows:
- Removal of the Coping Stones: In details where the covering is finished beneath the coping stone, renewing the covering may require the surrounding stones to be removed.
- Renovation Rubble and Dust: The removed stone and mortar create site conditions in the garden; grass and landscaping may be damaged.
- Labour Cost: Demolition, rubble disposal, re-pouring of screed and laying the new coping can account for a significant part of the renovation budget. The exact proportion varies according to the project, the square metre figure and local labour prices.
02. The Sermed Hung Profile Locking Mechanism and the Demolition Free Renewal Sequence
The Hung profile system works on site according to the following principle:
- Concealed Locking Channel: An extruded profile of suitable section is mounted to the upper edge of the shell panels. The coping stone is seated on top of this profile; the locking channel of the profile remains concealed as a horizontal slot just above the water level.
- Factory Fitted Locking Bead (Harpoon/Bead): A flexible PVC bead with an arrowhead section is welded to the upper edge of the liner at the factory. Depending on the project, the liner can be selected as a 0.8 mm homogeneous or a 1.5 mm reinforced membrane.
- Demolition Free Removal and Fitting: When the liner is to be renewed, the old bead is pulled out of the channel. The bead of the new liner is fitted into the profile, a vacuum unit is connected from behind to draw out the air, and the water is filled. Depending on the pool size, access and team size, putting the membrane in place generally takes a few hours; filling with water and establishing the chemical balance require additional time.
- Minimal Intervention in the Surroundings: When the detail is correctly executed, the need to intervene in the surrounding coverings and landscaping is reduced to a minimum. If repairs are needed to buried pipework, lighting or skimmer connections, the scope may widen; the necessary work is determined according to the engineer's diagnosis.
03. Comparison Table: Classic Demolition Renovation vs. Liner Replacement With a Hung Profile
The times and quantities below are not a contractual commitment but example planning assumptions for a typical villa pool.
| Replacement Criterion | Classic Ceramic / Mosaic Renewal | Sermed Liner Replacement With Hung Profile |
|---|---|---|
| Condition of Coping and Garden | The surrounding stones may need to be removed | If the detail is suitable, no intervention in the surrounding coverings is required |
| Rubble and Excavation | A considerable amount of construction rubble is produced | Rubble free application (the old liner is rolled up and removed) |
| Renewal Time | May take several weeks | Membrane replacement typically a few hours; excluding water filling |
| Renovation Budget | Demolition + stone + waterproofing (high total cost) | Essentially the cost of the new liner and its installation (generally more economical) |
| Freedom to Change Colour | Difficult and costly | A change to a different pattern and colour is possible whenever desired |
Conclusion: The Hung profile turns renewing the pool's covering into a plannable maintenance task. Whenever you want a change of colour, you can achieve a new look in a short time without turning your garden into a large construction site.
Frequently asked questions
When the liner needs renewing after 10 to 15 years, how is the covering removed without breaking the garden paving and the coping at the pool edge?
The liner membrane is not clamped beneath the coping stone; it is fitted into the concealed Hung locking profile immediately below the stone. The old liner is pulled out of the channel by its bead, and the new liner is locked into the same channel. In this way, under normal conditions, the need to intervene in the surrounding coverings is eliminated.
Is there a risk of the liner coming out of the locking profile by itself?
The locking bead has an arrowhead geometry, and the water load helps hold the bead inside the channel. Even so, the profile must be correctly installed, the bead section must suit the channel, and the liner tension must be correctly adjusted. In addition, even when the pool is full of water, if the external water pressure (groundwater) is higher than the internal water pressure, the liner may swell or move out of position; for this reason the drainage and groundwater situation must be assessed in the design.
Does the Hung profile rust?
The profiles are produced from rigid PVC or surface treated aluminium alloy; these materials are selected so as to show corrosion behaviour suited to the pool environment. Nevertheless, the installation detail must be followed for situations such as corrosion arising from contact between different metals and continuous exposure to concentrated chlorine vapour.
Can I change the colour of the pool after 5 years if I get bored of it?
Yes; thanks to the Hung profile you can drain the water whenever you wish and have a different liner fitted, such as beige, white or anthracite. Since the draining operation requires monitoring of groundwater and hydrostatic pressure, it must be carried out under expert supervision.