600 / 600
On the Batumi shoreline, where the water table is high, how is the risk of the shell floating (lifting) prevented when the pool is emptied in winter?
The most practical way to reduce this risk is not to empty the pool completely and without control over the winter. The mass of water inside the pool balances the uplift force of the groundwater; however, if the external water level exceeds the internal water level, liner lifting or stress on the shell can occur even in a full pool. In addition, a crushed stone bed placed at base level and perimeter drainage piping carry the groundwater to a control sump from where it is discharged.
If spring water or silt appears at the bottom of the pool, how is the excavation made safe?
If water appears at the bottom of the excavation, it is pumped out with a portable mud pump, the soft silt is scraped away, a stabilized crushed stone blinding is laid and compacted, and a membrane is spread over it before the reinforced base concrete is poured; this prevents mud from mixing into the concrete. The blinding thickness, concrete class and amount of reinforcement are indicative here; they must be redetermined by a qualified engineer once the flow rate of the spring water has been established.
Are an electrical supply and a pump essential for the drainage sump?
If your site cannot discharge by gravity into a stormwater channel or a stream bed through its natural slope, a submersible pump with a float switch must be placed at the bottom of the drainage sump and an independent electrical line must be run to it. All electrical work around the pool, including residual current protection, must be carried out by a qualified electrician in accordance with local electrical regulations; this is not an item for the owner to undertake alone.
Can groundwater move the liner while the pool is full?
Yes. If the pressure of the external groundwater behind the liner exceeds the water pressure inside the pool, the liner can lift even in a full pool. What matters is the internal and external water levels and whether the drainage is working. Being full is not a guarantee in itself; the pool should not be emptied before the water levels have been assessed by a specialist.
What infrastructure should be installed to drain the rainwater that overflows around the pool shell in Batumi's extreme rainfall regime?
A perforated drenflex pipe line wrapped in geotextile fabric and starting at the excavation base level should be laid around the pool shell, covered with gravel, and this line should be connected to the stormwater drain on the sloping side of the garden or to an inspection well with an automatic submersible pump.
Why does the skimmer overflow discharge clog and how is this prevented?
It can clog when the skimmer overflow pipe diameter is chosen too small (such as Ø32 mm) or when no leaf trap is fitted. The recommended practice is to use rigid PVC pipe of at least Ø50 mm and to connect the line to a closed drainage system; the final diameter must be calculated according to the pool surface area and the design rainfall.
What should be done if heavy rain starts immediately after the excavation has been dug?
Water must not be allowed to pond on the excavation base; a temporary collection sump should be opened in the deepest corner of the pit and the water discharged continuously with a portable pump; the C30 concrete pour should be completed before the base turns to mud.
How does rainwater affect the pool's chemical balance?
Rainwater can generally be slightly acidic and carries atmospheric dust and an organic load into the pool. After heavy rain the pH and disinfectant level can change. For this reason the water must always be measured with a test kit after a storm, the pH brought to the generally accepted range of 7.2–7.6, and disinfectant topped up if the measurement requires it. The quantity of chemical to be used is determined by the measurement result and the dose on the product label; chemicals are never mixed with one another, each is added separately and diluted according to its instructions.
What is the corrosion-free pool frame and fastener standard for villas 200–500 metres from the sea?
To reduce the corrosion risk by the sea, a 20 mm F-Stone fibre cement panel shell (Fiplus) or a special alloy steel casing (oval Maldiv, round Bora) can be preferred; in Fiplus the galvanized steel external cross legs are a separate component and require coating protection and periodic inspection. At least AISI-304 is recommended for the assembly bolts, ladders and anchors, and AISI-316 stainless steel for parts in direct contact with water. The final choice must be verified according to the product's technical documentation and the corrosion class of the project.
Does the corrosion risk increase when a salt chlorinator is used?
Yes, the corrosion risk rises because the chloride concentration increases. The required salt concentration varies by device; only the value in the chlorinator manufacturer's user manual should be taken as the basis, and the water should be monitored by measurement. When this system is selected, it is recommended that the metal components in the pool (ladder, light screws, pump components and so on) be selected from chloride-resistant grades, preferably AISI-316 stainless steel. AISI-316 is not a titanium alloy; it is a molybdenum-bearing grade of stainless steel, while titanium-based parts are used in the cell electrodes.
How is the MyBox filter cabinet fixed down against coastal winds and storms?
The MyBox cabinet is fixed with suitable anchor components to an extension of the base concrete or to a separately poured concrete plinth; the plinth thickness and anchor type must be determined according to the weight of the cabinet and the wind load of the region. For the behaviour of the lid lock under storm loading, the product's own technical documentation should be consulted. All electrical connections inside the cabinet, including residual current protection, must be carried out by a qualified electrician in compliance with local regulations.
Is the liner affected by salty coastal humidity?
The liner is a PVC-based organic polymer membrane and does not corrode like metal; salty humidity alone does not rot the liner. However, liner life is affected by UV, temperature, incorrect chemical dosing and mechanical strain, so it would not be correct to say it is "completely unaffected". The liner's main function is to form the watertight barrier that separates the load-bearing shell behind it from the water.
On the soft or sandy coastal soil of Kobuleti, what base concrete thickness and reinforcement are needed to prevent the pool from settling?
The manufacturer's reference detail is 20 cm thick C30 concrete with Q131 steel mesh reinforcement placed within it; before the concrete is poured, it is recommended that the soil be compacted and a crushed stone blinding layer laid over it. These figures are a starting reference: the actual thickness, concrete class, reinforcement layout and blinding thickness must be determined plot by plot through a geotechnical investigation and structural calculation.
Why is power float finishing of the base concrete important?
The liner is laid directly over the base concrete (with a suitable protective felt in between). Protruding stones or undulations on the concrete surface can be felt through the liner; power float finishing produces a smooth, velvety base.
What should be done if the surrounding sand flows inwards during excavation?
Work is stopped and access to the area at risk of collapse is prevented. A qualified engineer determines the appropriate slope or temporary shoring solution after assessing water conditions, neighbouring structures and soil properties. Work only continues once a safe excavation arrangement has been established.
How should the area around the pool be backfilled on sandy ground?
The backfill material, drainage and compaction method must be selected in line with the approved assembly detail of the pool model. Uncontrolled loose fill and sea sand whose suitability has not been verified must not be used. Crushed stone of 10 to 20 mm and 30 cm layers are examples of practice; they are not a mandatory recipe for every model. The compaction energy is set so that it will not damage the panels and connections.
What should the distance be between the retaining wall and the pool frame when building a terraced garden pool on the sloping hillsides of Adjara?
In planning, a distance of roughly 1.00 meter is typically allowed. This gap provides working space for installation, the galvanized steel external cross bracing and the service connections, and thanks to the drainage line placed within it, it also helps prevent water seeping from the retaining structure from pressing against the pool. The exact distance is determined by a qualified engineer according to the wall height and the drainage solution.
How is the ground supported if the pool overhangs on the valley side?
On the valley side the pool base concrete is supported by reinforced concrete tie beams or mini retaining walls bearing on bedrock or firm ground; the pool is never left cantilevered over a void, and the C30 base slab must bear fully on firm ground.
Can an infinity pool be built on steep slopes?
It is possible given suitable ground and structural conditions; an infinity pool opening onto the view can be planned with Fiplus panels by integrating a weir channel and a balance tank on the elevation facing the valley. The additional loads at the weir elevation and the slope stability must be verified by calculation by a qualified engineer on every project.
Where should the plant room for a hillside pool be located?
The plant room (MyBox) is usually placed below the pool water level, under the terrace on the valley side; the pump then works with positive suction and is less likely to draw air. In spaces below the water level, a drainage, ventilation and discharge solution must be planned against the risk of flooding. The electrical installation must be carried out by a qualified person in accordance with local standards, and changes to the filter valve position must always be made with the pump switched off.