Pool models, construction conditions and care to help you plan your project.
In this guide 4
- 01How the Pool Construction Stage Becomes a Bottleneck for Project Cash Flow in Multi-Unit Housing Developments
- 02Sermed Havuz's Parallel Installation Architecture: A Simultaneous Installation Model Across 10 Villas
- 03Reinforced Concrete vs. Sermed Prefabricated: Construction and Cost Table for a 10-Villa Project
- 04Frequently Asked Questions
Calculation note: The prices, savings rates, energy consumption figures, rental income, installation durations and payback periods in this article are hypothetical planning examples only; they are not current Georgian pricing, verified operating results, delivery commitments or income guarantees. Actual budgets and schedules must be calculated using local quotations, tariffs, usage patterns and a written scope of work. Durations vary depending on site preparation, ground conditions, weather, permits and logistics.
For real estate developers and construction companies building multi-villa compounds (townhouses and detached villas) along the Batumi, Kvariati and Gonio corridor, a recurring problem is that villas whose shell construction is finished get stuck at the landscaping and pool stage. On a 10-villa project, building cast-in-place reinforced concrete pools can create prolonged heavy activity on site, with formwork, concrete mixer and tiling traffic, which may delay the landscaping handover and push back the schedule for final progress payments from buyers. This is not an inevitable outcome on every project; well planned reinforced concrete applications can also be carried out successfully. Sermed Havuz's modular production approach, by contrast, aims to shorten the installation stage: pool kits prepared in the factory are shipped in batches and installed simultaneously on site by parallel crews. The duration examples below are planning values based on the assumption that site preparation has been completed and that logistics proceed without disruption.
On large projects, profitability depends largely on how predictable the construction schedule is. Every unexpected day on site means overhead costs and delayed sales collections.
01. How the Pool Construction Stage Becomes a Bottleneck for Project Cash Flow in Multi-Unit Housing Developments
The difficulties most often seen in pool construction on multi-unit housing projects are as follows:
- The Contractor Cannot Close Out the Site: Having a large number of tradespeople working on site for a long time on the formwork and tiling of 10 separate reinforced concrete pools can delay the start of the surrounding landscaping.
- Delayed Final Progress Payments: Buyers may hesitate to sign the final handover documents for villas whose pool and surroundings are not finished, which can delay both the final payments and the contractor's cash flow.
- Workmanship Variation and Deviation From Standards: In reinforced concrete pools poured individually on site, levels and surface quality can differ from crew to crew, which may lead to quality disputes with customers at handover.
02. Sermed Havuz's Parallel Installation Architecture: A Simultaneous Installation Model Across 10 Villas
Sermed Havuz offers corporate developers the following solution partnership:
- Bulk Logistics and Shipment Planning: The panels, liners and MyBox units belonging to the pools are shipped from Duzce in planned batches and unloaded at the site; customs and shipping times depend on the route and on regulatory conditions.
- Parallel Installation Crews: The specialist installation crews assigned to the site can carry out the structural assembly and liner laying of pools whose base slabs are ready simultaneously.
- Standardized Production Quality and Written Warranty: Each villa's pool is built with 20 mm F-Stone fibre cement panels prepared in the factory (with galvanized steel external cross bracing as a separate component); this is intended to reduce workmanship variation. The body/casing warranty is 25 years on the Fiplus model and 10 years on the Maldiv and Bora models, and its scope is subject to the written warranty terms.
- Handover Together With the Landscaping: Once installation is complete, the pools can be handed over filled with water; the surrounding lawn and landscaping work can then proceed quickly so that the villas are made ready for turnkey delivery.
03. Reinforced Concrete vs. Sermed Prefabricated: Construction and Cost Table for a 10-Villa Project
The comparison below is a sample planning table based on the assumption that site preparation progresses as planned.
| Project Parameter (10 Pools) | Conventional Subcontracted Reinforced Concrete System | Sermed Havuz Industrial Solution Partnership |
|---|---|---|
| Total Construction Duration | Intensive construction traffic typically lasting several months, depending on scope and conditions | Sample planning for the installation stage: a few working weeks if the base slabs are ready (condition dependent) |
| Labour and Trade Management | Coordination of numerous formwork carpenters, steel fixers and tilers | Single-source specialist installation by Sermed Havuz |
| Quality Standard | Level and surface tolerances that can vary by installer | Dimensional repeatability of factory-made F-Stone panels |
| Warranty Commitment to the Buyer | Subcontractor warranty whose scope depends on the contract | Factory casing warranty subject to written terms: Fiplus 25 years, Maldiv/Bora 10 years |
| Cash Flow and Early Sales | Collections are deferred when handover is delayed | When installation time is shortened, the handover schedule can be brought forward; the time gained varies by project |
Conclusion: On large projects, a modular pool solution is an engineering choice with the potential to shorten the installation stage and make the schedule predictable.
Frequently asked questions
How does the delivery schedule of prefabricated pools speed up construction cash flow on multi-unit housing projects?
In a prefabricated system, shell installation and liner laying can be carried out simultaneously by parallel crews on pools whose base slab is ready, which can allow landscaping to start earlier. How much time is gained and how far collections can be brought forward depend on the project, the site conditions and the contract structure; no fixed number of days or guaranteed early delivery period can be given.
Can custom dimensions or corporate colours be selected for bulk orders?
Yes; dimensions tailored to the developer's architectural concept, L shapes, or project-specific liner colours such as grey, anthracite or beige can be considered according to the production schedule. The liner is specified as either a 0.8 mm homogeneous or a 1.5 mm reinforced option.
Is on-site supervision provided for the developer?
Yes; our site engineers can inspect the suitability of local subcontractor work, including excavation and the base slab, for pool installation, and can provide supervision. A 20 cm C30 concrete slab with Q131 mesh can be used as the manufacturer's reference detail; the final thickness, reinforcement and ground improvement must be determined according to the geotechnical and structural calculations for the site.
Can a demonstration pool be installed at the sales office on bulk projects?
Yes; a sample Bora or Fiplus pool can be installed in the garden of the project's launch and sales office so that potential buyers can see the product in person.

Fiplus ↗
Maldiv ↗
Bora ↗

